PCT NEWS
Record Broken: 6,500 sqm Produced in One Month!
Our production team has achieved an outstanding milestone this month by producing over 6,555 square meters of advanced composite panels. This impressive accomplishment marks the highest monthly production ever in PCT’s history. This incredible feat was part of our ongoing works on the Mataf Ceiling project in Makkah, KSA. Congratulations to everyone involved!
Paddington Square Architectural Mast
PCT engineered and fabricated a 30-meter high architectural mast on Level 17 of the Paddington Square Office building in London, designed by Renzo Piano Building Workshop. Constructed at PCT's facilities in Dubai, the mast uses advanced composite materials, specifically glass fiber-reinforced polymer (GFRP). The mast, built in two 15-meter segments, is designed to flexibly respond to wind forces.
PCT, UNStudios and CDS joint presentation for JEC Summit
We are excited to announce that the full video of our studio-recorded presentation from the JEC Group Summit Building and Infrastructure in Paris is now available. In this insightful session, Djibril Waimer (PCT), Eyukewe Dogo (UNStudio), and Radek Michalik (CDS) explore low carbon construction and fiber-reinforced polymer solutions, emphasizing the importance of collaboration for innovative and sustainable building practices.
Click the link below for the full video.