top of page

Dubai Metro 2020 Interiors

 
  
Scope of Supply:  
Project Duration: 
Train Manufacturer: 
Train Operating Country: 
Fire Norms: 
Surface Finish: 


Alstom, leader of the Expo Link consortium, has delivered the first of the 50 Metropolis train sets that will run on the Dubais red and green lines. The train is assembled at Alstom’s site in Katowice in Poland. The Metropolis train sets for Dubai are 85.5 meters long and composed of five cars each. They will be able to carry up to 700 passengers each. The train offers wide gangways, large doors and windows, three specific areas for Silver, Family and Gold Classes. The train is equipped with a full electrical braking system, LED lighting and other innovations to reduce energy...

 

- Cab fittings

- 2017 - 2019

- Alstom

- United Arab Emirates

- EN45545

- Painted + Anti Graffiti clear coat

Show more
bottom of page